Siemens SIMATIC ET 200S IM151-8 PN/DP CPU 6ES7151-8AB01-0AB0
Manufacturer: Siemens
Condition: Brand New
Lead Time: In Stock
Origin: Germany
Warranty: 12 Months
Email: [email protected]
whatsApp: +86-18150117685
- Overview
- Product Overview
- Key Functions
- Official Specifications
- Frequently Asked Questions
- Compatibility & Ordering Notes
- Hot Selling Models
- Recommended Products
Overview
SIEMENS · SIMATIC ET 200S
6ES7151-8AB01-0AB0 SIMATIC ET 200S IM151-8 PN/DP CPU
The IM151-8 PN/DP CPU provides 192 KB work memory, a three-port PROFINET IO controller interface and MMC-based project storage.
At a Glance
| Brand | Siemens |
|---|---|
| Model | 6ES7151-8AB01-0AB0 |
| Product Type | distributed PROFINET CPU interface module |
| Core Function | Combines ET 200S CPU processing with an integrated three-port PROFINET IO controller |
| Application or Compatible Series | Distributed ET 200S automation cells with PROFINET and optional DP connectivity |
Exact Identification
Match 6ES7151-8AB01-0AB0 character by character and confirm the complete SIMATIC ET 200S IM151-8 PN/DP CPU designation.
Interface Arrangement
Confirm the installed supply, ports, field connections and required accessories before wiring the replacement.
Configuration Check
Preserve the approved engineering project, network parameters and application data used by the installed system.
Product Overview
The IM151-8 PN/DP CPU provides 192 KB work memory, a three-port PROFINET IO controller interface and MMC-based project storage.
The CPU executes local automation tasks directly in an ET 200S station. Three RJ45 ports support line-oriented IO controller networks. The required MMC carries the matched program and configuration.
Key Functions
Distributed Controller
The CPU executes local automation tasks directly in an ET 200S station.
Integrated PROFINET Switch
Three RJ45 ports support line-oriented IO controller networks.
Memory-Card Project Storage
The required MMC carries the matched program and configuration.
Official Specifications
| Hardware Functional Status | 01 |
|---|---|
| Firmware Version | V3.2 |
| Work Memory | 192 KB |
| PROFINET Ports | 3 x RJ45 |
| PROFINET Role | IO controller |
| Engineering Baseline | STEP 7 V5.5 or TIA Portal V11 and later compatible releases |
| Rated Supply | 24 V DC |
| Permissible Supply Range | 20.4 to 28.8 V DC |
| Reverse Polarity Protection | Yes |
| Recommended Line Protection | Minimum 2 A |
| Typical Power Loss | 5.5 W |
| Memory Card | SIMATIC Micro Memory Card required |
| Maximum MMC Capacity | 8 MB |
| Isochronous Mode | Not supported |
| Minimum Bit Operation Time | 0.06 µs |
| Minimum Word Operation Time | 0.12 µs |
Frequently Asked Questions
What should an engineer verify about hardware functional status before replacing 6ES7151-8AB01-0AB0?
Confirm 01 and compare it with the installed hardware, wiring and saved configuration before removal.
How should firmware version be matched when commissioning 6ES7151-8AB01-0AB0?
Use V3.2, then retain the matching interface, project and parameter settings during commissioning.
Is 6ES7151-8AB01-0AB0 suitable when the project requires the stated work memory?
It supports 192 KB; the complete system must also meet the electrical, mechanical and engineering requirements.
What installation check applies to profinet ports on 6ES7151-8AB01-0AB0?
Verify 3 x RJ45, complete the associated wiring or configuration checks and record the result before startup.
Can 6ES7151-8AB01-0AB0 be substituted without confirming profinet role?
No. Confirm IO controller together with the connector arrangement and project settings before approving a replacement.
Why does engineering baseline matter when integrating 6ES7151-8AB01-0AB0?
The required condition is STEP 7 V5.5 or TIA Portal V11 and later compatible releases; a mismatch can prevent communication, correct control or safe operation.
What should be tested for rated supply after installing 6ES7151-8AB01-0AB0?
Test operation with 24 V DC, review diagnostics and complete the required functional and safety checks before service.
Compatibility & Ordering Notes
Compatibility Checklist
- Match hardware functional status (01) to the installed system.
- Verify firmware version (V3.2) before changing wiring or configuration.
- Back up all available project, parameter and network data, then complete the required functional and safety checks.