- Overview
- Product Overview
- Key Functions
- Official Specifications
- Frequently Asked Questions
- Compatibility & Ordering Notes
- Hot Selling Models
- Recommended Products
Overview
SIEMENS · SIMOVERT MASTERDRIVES
6SE7038-6GL84-1JA1 SIMOVERT MASTERDRIVES PSU2 Power Supply Module
The PSU2 is an exact internal power-supply spare for SIMOVERT MASTERDRIVES units in design sizes J through M.
At a Glance
| Brand | Siemens |
|---|---|
| Model | 6SE7038-6GL84-1JA1 |
| Product Type | internal PSU2 power supply module spare part |
| Core Function | Provides the specified internal power-supply assembly for large MASTERDRIVES units |
| Application or Compatible Series | SIMOVERT MASTERDRIVES chassis units with mechanical designs J through M |
Exact Identification
Match 6SE7038-6GL84-1JA1 character by character and confirm the complete SIMOVERT MASTERDRIVES PSU2 Power Supply Module designation.
Interface Arrangement
Confirm the installed supply, ports, field connections and required accessories before wiring the replacement.
Configuration Check
Preserve the approved engineering project, network parameters and application data used by the installed system.
Product Overview
The PSU2 is an exact internal power-supply spare for SIMOVERT MASTERDRIVES units in design sizes J through M.
The PSU2 version is intended for MASTERDRIVES designs J through M. The module belongs to the converter power and control assembly rather than an external supply. Connector orientation, installed design size and discharge procedure must be verified before work.
Key Functions
Design-Size Specificity
The PSU2 version is intended for MASTERDRIVES designs J through M.
Internal Drive Supply
The module belongs to the converter power and control assembly rather than an external supply.
Exact Spare Exchange
Connector orientation, installed design size and discharge procedure must be verified before work.
Official Specifications
| Module Designation | PSU2 |
|---|---|
| Compatible Mechanical Designs | J through M |
| Installed Equipment | SIMOVERT MASTERDRIVES |
| Assembly Role | Internal power supply module |
| Supply Form | Spare part |
| Migration Direction | LV SINAMICS |
| Lifecycle Status | Discontinued |
| Packaging Length | 29.00 cm |
| Packaging Width | 27.00 cm |
| Packaging Height | 8.00 cm |
| Net Weight | 1.32 kg |
Frequently Asked Questions
What should an engineer verify about module designation before replacing 6SE7038-6GL84-1JA1?
Confirm PSU2 and compare it with the installed hardware, wiring and saved configuration before removal.
How should compatible mechanical designs be matched when commissioning 6SE7038-6GL84-1JA1?
Use J through M, then retain the matching interface, project and parameter settings during commissioning.
Is 6SE7038-6GL84-1JA1 suitable when the project requires the stated installed equipment?
It supports SIMOVERT MASTERDRIVES; the complete system must also meet the electrical, mechanical and engineering requirements.
What installation check applies to assembly role on 6SE7038-6GL84-1JA1?
Verify Internal power supply module, complete the associated wiring or configuration checks and record the result before startup.
Can 6SE7038-6GL84-1JA1 be substituted without confirming supply form?
No. Confirm Spare part together with the connector arrangement and project settings before approving a replacement.
Why does migration direction matter when integrating 6SE7038-6GL84-1JA1?
The required condition is LV SINAMICS; a mismatch can prevent communication, correct control or safe operation.
What should be tested for lifecycle status after installing 6SE7038-6GL84-1JA1?
Test operation with Discontinued, review diagnostics and complete the required functional and safety checks before service.
Compatibility & Ordering Notes
Compatibility Checklist
- Match module designation (PSU2) to the installed system.
- Verify compatible mechanical designs (J through M) before changing wiring or configuration.
- Back up all available project, parameter and network data, then complete the required functional and safety checks.