Siemens SIMATIC S7-400 6ES7414-3XM05-0AB0 CPU 414-3
Manufacturer: Siemens
Condition: Brand New
Lead Time: In Stock
Origin: Germany
Warranty: 12 Months
Email: [email protected]
whatsApp: +86-18150117685
- Overview
- Product Overview
- Key Functions
- Official Specifications
- Frequently Asked Questions
- Compatibility & Ordering Notes
- Hot Selling Models
- Recommended Products
Overview
6ES7414-3XM05-0AB0 CPU 414-3
Officially documented SIMATIC S7-400 component for central S7-400 automation with dual serial process-network interfaces.
At a Glance
| Brand / Manufacturer | Siemens |
|---|---|
| Model / Article Number | 6ES7414-3XM05-0AB0 |
| Product Type | CPU 414-3 |
| Core Function | Full Siemens article number 6ES7414-3XM05-0AB0 for exact spare-part matching. |
| Application / Compatible Series | SIMATIC S7-400 |
Exact Identification
Match the complete article number 6ES7414-3XM05-0AB0, photographed nameplate and installed firmware or hardware revision before replacement.
Interface Arrangement
Confirm two RS485 interfaces for MPI/DP and PROFIBUS DP communication used by the installed project.
Configuration Check
Verify STEP 7 hardware configuration for firmware V5.3 and a compatible S7-400 memory card before commissioning.
Product Overview
Siemens SIMATIC S7-400 6ES7414-3XM05-0AB0 CPU 414-3 is an officially documented SIMATIC S7-400 product designed for central S7-400 automation with dual serial process-network interfaces. Its article number identifies the exact hardware variant and should be matched in full when planning a replacement or spare.
The unit provides two RS485 interfaces for MPI/DP and PROFIBUS DP communication. Engineering, firmware, memory, rack, field wiring and network settings must be checked against the active project before installation.
Key Functions
Model-specific identification
Full Siemens article number 6ES7414-3XM05-0AB0 for exact spare-part matching.
System role
Designed for central S7-400 automation with dual serial process-network interfaces.
Integrated communication
Provides two RS485 interfaces for MPI/DP and PROFIBUS DP communication.
Engineering continuity
Check STEP 7 hardware configuration for firmware V5.3 and a compatible S7-400 memory card.
Power planning
5 V DC backplane current 1.1 A typical, 1.3 A maximum; typical power loss 5.5 W
Official Specifications
| CPU / Firmware | CPU 414-3 / V5.3 |
|---|---|
| Work Memory | 2.8 MB total: 1.4 MB code / 1.4 MB data |
| Bit / Word / Fixed-Point Operation Time | 45 ns |
| Floating-Point Operation Time | 135 ns |
| Integrated Interfaces | 2 RS485: MPI/DP and PROFIBUS DP |
| Backplane Current at 5 V DC | 1.1 A typical / 1.3 A maximum |
| Power Loss | Typical 5.5 W |
| Dimensions (W × H × D) | 50 × 290 × 219 mm |
| Weight | Approx. 900 g |
Frequently Asked Questions
How should the firmware level be matched when replacing 6ES7414-3XM05-0AB0?
The documented unit uses firmware generation V5.3, so the project hardware configuration and firmware compatibility should be checked first.
What usable work memory does 6ES7414-3XM05-0AB0 provide?
A total of 2.8 MB is available, divided into 1.4 MB for code and 1.4 MB for data.
Which serial networks can be connected to 6ES7414-3XM05-0AB0?
Two RS-485 interfaces provide MPI/DP and PROFIBUS DP communication.
What CPU timing data is relevant for 6ES7414-3XM05-0AB0?
Typical bit, word and fixed-point operations are 45 ns; floating-point operations are 135 ns.
What backplane loading should be planned for 6ES7414-3XM05-0AB0?
Plan for about 1.1 A typical and 1.3 A maximum at 5 V DC, with approximately 5.5 W power loss.
Which storage medium should be checked for 6ES7414-3XM05-0AB0?
Verify the fitted SIMATIC memory card, its capacity and the saved user program before removal.
What commissioning records should accompany 6ES7414-3XM05-0AB0?
Keep the STEP 7 project, station configuration, interface addresses and current firmware record with the replacement work order.
Compatibility & Ordering Notes
S7-400 CPU 414-3 Installation Checklist for 6ES7414-3XM05-0AB0
- Compare every character of the nameplate article number.
- Confirm the firmware or hardware revision supported by the engineering project.
- Check rack, connector, memory, power and environmental requirements.
- Record addressing, station names, redundancy and network parameters before removal.
- Keep a verified project backup and follow the official manufacturer installation instructions.