Siemens SIMATIC S7-400H CPU 417-4H 6ES7417-4HL01-0AB0
Manufacturer: Siemens
Condition: Brand New
Lead Time: In Stock
Origin: Germany
Warranty: 12 Months
Email: [email protected]
whatsApp: +86-18150117685
- Overview
- Product Overview
- Key Functions
- Official Specifications
- Frequently Asked Questions
- Compatibility & Ordering Notes
- Hot Selling Models
- Recommended Products
Overview
SIEMENS • SIMATIC S7-400H
6ES7417-4HL01-0AB0 SIMATIC S7-400H CPU 417-4H
The CPU 417-4H is a fault-tolerant S7-400H central processing unit with separate code and data memory, MPI/DP and PROFIBUS DP communication, and two dedicated synchronization-module slots.
At a Glance
| Brand | Siemens |
|---|---|
| Model | 6ES7417-4HL01-0AB0 |
| Product Type | High-availability controller CPU |
| Core Function | Runs coordinated redundant control in fault-tolerant automation systems |
| Application or Compatible Series | SIMATIC S7-400H and F-capable high-availability installations |
Exact Identification
Match 6ES7417-4HL01-0AB0 character by character and confirm the complete SIMATIC S7-400H CPU 417-4H designation.
Interface Arrangement
Confirm the installed supply, ports, field connections and required accessories before wiring the replacement.
Configuration Check
Preserve the approved engineering project, network parameters and application data used by the installed system.
Product Overview
The CPU 417-4H is a fault-tolerant S7-400H central processing unit with separate code and data memory, MPI/DP and PROFIBUS DP communication, and two dedicated synchronization-module slots.
A matched pair can operate as an S7-400H redundant system with automatic synchronization and redundancy diagnostics. The CPU provides one MPI/DP interface, one PROFIBUS DP interface and two slots reserved for synchronization modules. The H-CPU performs a self-test after power-on and supports the redundancy event organization blocks used by the H system.
Key Functions
Fault-Tolerant Processing
A matched pair can operate as an S7-400H redundant system with automatic synchronization and redundancy diagnostics.
Dedicated H-System Interfaces
The CPU provides one MPI/DP interface, one PROFIBUS DP interface and two slots reserved for synchronization modules.
Power-On Self-Test
The H-CPU performs a self-test after power-on and supports the redundancy event organization blocks used by the H system.
Official Specifications
| Hardware Version | 01 |
|---|---|
| Firmware Version | V2.1.1 |
| Engineering Software | STEP 7 V5.1 or higher |
| Integrated Work Memory | 4 MB total: 2 MB code and 2 MB data |
| First Interface | MPI/DP with 32 MPI or 16 DP connection resources |
| Second Interface | PROFIBUS DP with 16 connection resources |
| Maximum DP Slaves | 96 on the second interface |
| Second-Interface Address Area | 6 KB inputs and 6 KB outputs |
| Synchronization Interfaces | 2 dedicated slots for H-sync modules |
| Communication Connections | 64 |
| Process Image Capacity | 16 KB inputs and 16 KB outputs |
| 5 V Backplane Current | 1.6 A typical; 1.8 A maximum |
| 24 V Backplane Current | 0.3 A maximum |
| Power-On Self-Test | Supported |
| Redundancy Event Blocks | OB70 and OB72 |
| Interface-Slot Restriction | Synchronization modules only; DP interface modules are not supported in the two H-sync slots |
Frequently Asked Questions
Which STEP 7 release is required to configure 6ES7417-4HL01-0AB0?
Engineering requires STEP 7 V5.1 or a later compatible release.
How much work memory is available in 6ES7417-4HL01-0AB0?
The CPU provides 4 MB in total, divided equally between code and data.
Can standard DP interface modules be installed in the synchronization slots of 6ES7417-4HL01-0AB0?
Those two slots are reserved exclusively for H-system synchronization modules.
How many DP slaves can the second interface of 6ES7417-4HL01-0AB0 control?
The second PROFIBUS DP interface supports up to 96 slaves.
Does 6ES7417-4HL01-0AB0 perform a self-test after power is applied?
The H-CPU performs a self-test after power-on.
Which redundancy organization blocks are relevant to 6ES7417-4HL01-0AB0?
The controller supports OB70 and OB72 for redundancy events.
What must be aligned when replacing one CPU in a 6ES7417-4HL01-0AB0 redundant pair?
The two sides must use compatible hardware, firmware, synchronization modules and project configuration.
Compatibility & Ordering Notes
Compatibility Checklist
- Use matched and compatible CPUs on both sides of the redundant station.
- Keep the two H-sync module slots free of ordinary DP interface modules.
- Preserve the S7-400H project and synchronization-link configuration before replacement.